Warehouse management system implementation checklist

What to settle before, during and after a WMS rollout: floor walk, location scheme, labels, picking method, counts and go-live.

By SALES TEC LLC ·

Warehouse system projects succeed or fail on the floor. This checklist covers what to settle before, during and after implementation.

Do you need a WMS?

  • Pickers need directed put-away and pick paths because stock is spread across many locations.
  • You control lots, serials or expiry dates, or need recall traceability.
  • Several people pick the same order, or pick errors cost you customers or chargebacks.
  • Receiving is a bottleneck, or put-away is done from memory.
  • Your ERP's inventory module cannot represent how goods move.

Before you build or buy

  1. Walk the floor on a busy day and draw the real flow: receive, put away, pick, pack, ship, return.
  2. Write down handling rules: FIFO or FEFO, hazmat, temperature, fragile, oversized.
  3. Design the location scheme, for example aisle, bay, level and position, and label the racks physically before go-live.
  4. Clean the item master: units of measure, dimensions, weights and barcodes.
  5. List every system that must exchange data: ERP, storefronts, carriers, label printers, EDI.
  6. Choose devices and printers, and run a Wi-Fi survey of every aisle and dock door. Test label stock and printers on real labels.
  7. Decide the picking method by lines per order and SKU density: single-order, batch, wave or zone.
  8. Slot fast movers near shipping by velocity class.

Labels and identifiers

  • Use GTINs on cases and items where your suppliers and customers already do.
  • Print SSCC pallet labels in GS1-128 where retailers require them.
  • Give every pallet or tote a license plate so movements are scans, not typing.

Inventory rules to define

  • Statuses: available, quarantine, damaged, on hold.
  • Receiving tolerances for over, short and damaged.
  • Cycle-count frequency by class, blind counts, and variance thresholds that need approval.
  • The returns flow: inspect, decide restock, refurbish or scrap, and post.

During implementation

  • Test with your products and your pickers, not only the project team.
  • Rehearse receiving, picking and shipping on a copy of live data more than once.
  • Train in small groups on the floor with the real devices.
  • Take a full count as the starting point and reconcile it to the system.
  • Set parallel-run or rollback criteria before go-live. Roll out one zone or one client first where possible.

The first month after go-live

  • Have someone from the project on the floor for the first shifts.
  • Track pick accuracy, dock-to-stock time and count variance from day one.
  • Collect small annoyances daily and fix the quick ones fast, because staff trust the system when it stops getting in their way.
  • Review at 30 days and plan the next round.